Bid Protests are important to all government contractors - big or small. Either as an unsuccessful bidder protesting an award or as an awardee who’s protecting their award, understanding the protests process is critical.
Due to the recent economic changes, Bid Protests have become much more important to Government contractors. Filings of protests have increased sharply over the past two years. More protests have been filed in the past two years than have been filled from 1998 to 2008 combined. Over the past four years, we have seen our Bid Protest's success rate climb past 60%, while the national average is just below 30%.
Malyszek & Malyszek specializes in supporting:
One of the main factors for our success rate is that we will only protest valid issues. We attempt to lay out the risks of protests to our clients prior to filing. We also aggressively pursue other potential outcomes and alternative dispute resolutions to resolve protests that benefit both our clients and the agency.
If you are considering filing a bid protest, the first thing you should do is contact Malyszek & Malyszek as soon as possible to ensure that your critical deadlines have not passed. There are many time sensitive statutory and legal triggers that protestors must know.
Our clients that have successfully filed a protest have received the benefits of the awarded contract for up to a five year period. Many contractors are realizing the benefits of being awarded a contract, which could last up to five years. The benefits must outweigh the financial risk of the protest.
§ 21.0 Definitions.
(a)(1) Interested party means an actual or prospective bidder or offeror whose direct economic interest would be affected by the award of a contract or by the failure to award a contract.
(2) In a public-private competition conducted under Office of Management and Budget Circular A–76 –76 regarding performance of an activity or function of a Federal agency, or a decision to convert a function performed by Federal employees to private sector performance without a competition under OMB Circular A-76, interested party also means
(A) The official responsible for submitting the Federal agency tender, and
(B) Any one individual, designated as an agent by a majority of the employees performing that activity or function, who represents the affected employees.
(b)(1) Intervenor means an awardee if the award has been made or, if no award has been made, all bidders or offerors who appear to have a substantial prospect of receiving an award if the protest is denied.
(2) If an interested party files a protest in connection with a public-private competition conducted under OMB Circular A–76 regarding an activity or function of a Federal agency, the official responsible for submitting the Federal agency tender, or the agent representing the Federal employees as described in paragraph (a)(2)(B) of this section, or both, may also be intervenors.
(c) Federal agency or agency means any executive department or independent establishment in the executive branch, including any wholly owned government corporation, and any establishment in the legislative or judicial branch, except the Senate, the House of Representatives, and the Architect of the Capitol and any activities under his direction.
(d) Days are calendar days. In computing any period of time described in Subchapter V, Chapter 35 of Title 31, United States Code, including those described in this part, the day from which the period begins to run is not counted, and when the last day of the period is a Saturday, Sunday, or Federal holiday, the period extends to the next day that is not a Saturday, Sunday, or Federal holiday. Similarly, when the Government Accountability Office (GAO), or another Federal agency where a submission is due, is closed for all or part of the last day, the period extends to the next day on which the agency is open.
(e) Adverse agency action is any action or inaction by an agency that is prejudicial to the position taken in a protest filed with the agency, including a decision on the merits of a protest; the opening of bids or receipt of proposals, the award of a contract, or the rejection of a bid or proposal despite a pending protest; or agency acquiescence in continued and substantial contract performance.
(f) A document is filed on a particular day when it is received by GAO by 5:30 p.m., Eastern Time, on that day. Protests and other documents may be filed by hand delivery, mail, commercial carrier, facsimile transmission (202-512-9749), or e-mail (protests@gao.gov). Please check GAO’s Web site (http://www.gao.gov/legal/bidprotest.html) for current filing information. Hand delivery and other means of delivery may not be practicable during certain periods due, for example, to security concerns or equipment failures. The filing party bears the risk that the delivery method chosen will not result in timely receipt at GAO.
(g) Alternative dispute resolution encompasses various means of resolving cases expeditiously, without a written decision, including techniques such as outcome prediction and negotiation assistance.
§ 21.1 Filing a protest.
(a) An interested party may protest a solicitation or other request by a Federal agency for offers for a contract for the procurement of property or services; the cancellation of such a solicitation or other request; an award or proposed award of such a contract; and a termination of such a contract, if the protest alleges that the termination was based on improprieties in the award of the contract.
(b) Protests must be in writing and addressed as follows: General Counsel, Government Accountability Office, 441 G Street, NW., Washington, DC 20548, Attention: Procurement Law Control Group.
(c) A protest filed with GAO shall:
(1) Include the name, street address, electronic mail address, and telephone and facsimile numbers of the protester,
(2) Be signed by the protester or its representative,
(3) Identify the agency and the solicitation and/or contract number,
(4) Set forth a detailed statement of the legal and factual grounds of protest including copies of relevant documents,
(5) Set forth all information establishing that the protester is an interested party for the purpose of filing a protest,
(6) Set forth all information establishing the timeliness of the protest,
(7) Specifically request a ruling by the Comptroller General of the United States, and
(8) State the form of relief requested.
(d) In addition, a protest filed with GAO may:
(1) Request a protective order,
(2) Request specific documents, explaining the relevancy of the documents to the protest grounds, and
(3) Request a hearing, explaining the reasons that a hearing is needed to resolve the protest.
(e) The protester shall furnish a complete copy of the protest, including all attachments, to the individual or location designated by the agency in the solicitation for receipt of protests, or if there is no designation, to the contracting officer. The designated individual or location (or, if applicable, the contracting officer) must receive a complete copy of the protest and all attachments not later than 1 day after the protest is filed with GAO. The protest document must indicate that a complete copy of the protest and all attachments are being furnished within 1 day to the appropriate individual or location.
(f) No formal briefs or other technical forms of pleading or motion are required. Protest submissions should be concise and logically arranged, and should clearly state legally sufficient grounds of protest. Protests of different procurements should be separately filed.
(g) Unless precluded by law, GAO will not withhold material submitted by a protester from any party outside the government after issuing a decision on the protest, in accordance with GAO’s rules at 4 CFR part 81. If the protester believes that the protest contains information which should be withheld, a statement advising of this fact must be on the front page of the submission. This information must be identified wherever it appears, and the protester must file a redacted copy of the protest which omits the information with GAO and the agency within 1 day after the filing of its protest with GAO.
(h) Parties who intend to file documents containing classified information should notify GAO in advance to obtain advice regarding procedures for filing and handling the information.
(i) A protest may be dismissed for failure to comply with any of the requirements of this section, except for the items in paragraph (d) of this section. In addition, a protest shall not be dismissed for failure to comply with paragraph (e) of this section where the contracting officer has actual knowledge of the basis of protest, or the agency, in the preparation of its report, was not prejudiced by the protester’s noncompliance.
§ 21.2 Time for filing.
(a)(1) Protests based upon alleged improprieties in a solicitation which are apparent prior to bid opening or the time set for receipt of initial proposals shall be filed prior to bid opening or the time set for receipt of initial proposals. In procurements where proposals are requested, alleged improprieties which do not exist in the initial solicitation but which are subsequently incorporated into the solicitation must be protested not later than the next closing time for receipt of proposals following the incorporation.
(2) Protests other than those covered by paragraph (a)(1) of this section shall be filed not later than 10 days after the basis of protest is known or should have been known (whichever is earlier), with the exception of protests challenging a procurement conducted on the basis of competitive proposals under which a debriefing is requested and, when requested, is required. In such cases, with respect to any protest basis which is known or should have been known either before or as a result of the debriefing, the initial protest shall not be filed before the debriefing date offered to the protester, but shall be filed not later than 10 days after the date on which the debriefing is held.
(3) If a timely agency-level protest was previously filed, any subsequent protest to GAO filed within 10 days of actual or constructive knowledge of initial adverse agency action will be considered, provided the agency-level protest was filed in accordance with paragraphs (a)(1) and (a)(2) of this section, unless the agency imposes a more stringent time for filing, in which case the agency’s time for filing will control. In cases where an alleged impropriety in a solicitation is timely protested to an agency, any subsequent protest to GAO will be considered timely if filed within the 10-day period provided by this paragraph, even if filed after bid opening or the closing time for receipt of proposals.
(b) Protests untimely on their face may be dismissed. A protester shall include in its protest all information establishing the timeliness of the protest; a protester will not be permitted to introduce for the first time in a request for reconsideration information necessary to establish that the protest was timely.
(c) GAO, for good cause shown, or where it determines that a protest raises issues significant to the procurement system, may consider an untimely protest.
§ 21.3 Notice of protest, submission of agency report, and time for filing of comments on report.
(a) GAO shall notify the agency by telephone within 1 day after the filing of a protest, and, unless the protest is dismissed under this part, shall promptly send a written confirmation to the agency and an acknowledgment to the protester. The agency shall immediately give notice of the protest to the contractor if award has been made or, if no award has been made, to all bidders or offerors who appear to have a substantial prospect of receiving an award. The agency shall furnish copies of the protest submissions to those parties, except where disclosure of the information is prohibited by law, with instructions to communicate further directly with GAO. All parties shall furnish copies of all protest communications to the agency and to other participating parties. All protest communications shall be sent by means reasonably calculated to effect expeditious delivery.
(b) An agency or intervenor which believes that the protest or specific protest allegations should be dismissed before submission of an agency report should file a request for dismissal as soon as practicable.
(c) The agency shall file a report on the protest with GAO within 30 days after the telephone notice of the protest from GAO. The report provided to the parties need not contain documents which the agency has previously furnished or otherwise made available to the parties in response to the protest. At least 5 days prior to the filing of the report, in cases in which the protester has filed a request for specific documents, the agency shall respond to the request for documents in writing. The agency’s response shall, at a minimum, identify whether the requested documents exist, which of the requested documents or portions thereof the agency intends to produce, which of the requested documents or portions thereof the agency intends to withhold, and the basis for not producing any of the requested documents or portions thereof. Any objection to the scope of the agency’s proposed disclosure or nondisclosure of documents must be filed with GAO and the other parties within 2 days of receipt of this list.
(d) The report shall include the contracting officer’s statement of the relevant facts, including a best estimate of the contract value, a memorandum of law, and a list and a copy of all relevant documents, or portions of documents, not previously produced, including, as appropriate: the protest; the bid or proposal submitted by the protester; the bid or proposal of the firm which is being considered for award, or whose bid or proposal is being protested; all evaluation documents; the solicitation, including the specifications; the abstract of bids or offers; and any other relevant documents. In appropriate cases, a party may request that another party produce relevant documents, or portions of documents, that are not in the agency’s possession.
(e) Subject to any protective order issued in the protest pursuant to § 21.4, the agency shall simultaneously furnish a copy of the report to the protester and any intervenors. The copy of the report filed with GAO shall list the parties who have been furnished copies of the report. Where a protester does not have counsel admitted to a protective order and documents are withheld from the protester in accordance with this part, the agency shall provide documents adequate to inform the protester of the basis of the agency’s position.
(f) The agency may request an extension of time for the submission of the list of documents to be provided by the agency pursuant to § 21.3(c) or for the submission of the agency report. Extensions will be granted on a case-by-case basis.
(g) The protester may request additional documents after receipt of the agency report when their existence or relevance first becomes evident. Except when authorized by GAO, any request for additional documents must be filed with GAO and the agency not later than 2 days after their existence or relevance is known or should have been known, whichever is earlier. The agency shall provide the requested documents, or portions of documents, and a list to GAO and the other parties within 2 days or explain why it is not required to produce the documents.
(h) Upon the request of a party, GAO will decide whether the agency must provide any withheld documents, or portions of documents, and whether this should be done under a protective order. When withheld documents are provided, the protester’s comments on the agency report shall be filed within the original comment filing period unless GAO determines that an extension is appropriate.
(i) Comments on the agency report shall be filed with GAO within 10 days after receipt of the report, with a copy provided to the agency and other participating parties. The protest shall be dismissed unless the protester files comments within the 10-day period, except where GAO has granted an extension or has established a shorter period in accordance with § 21.10(e). Extensions will be granted on a case-by-case basis. Unless otherwise advised by the protester, GAO will assume the protester received the agency report by the due date specified in the acknowledgment of protest furnished by GAO.
(j) GAO may request or permit the submission of additional statements by the parties and by other parties not participating in the protest as may be necessary for the fair resolution of the protest. The agency and other parties must receive GAO’s approval before submitting any additional statements. GAO reserves the right to disregard material submitted without prior approval.
§ 21.4 Protective orders.
(a) At the request of a party or on its own initiative, GAO may issue a protective order controlling the treatment of protected information. Such information may include proprietary, confidential, or source-selection-sensitive material, as well as other information the release of which could result in a competitive advantage to one or more firms. The protective order shall establish procedures for application for access to protected information, identification and safeguarding of that information, and submission of redacted copies of documents omitting protected information. Because a protective order serves to facilitate the pursuit of a protest by a protester through counsel, it is the responsibility of protester’s counsel to request that a protective order be issued and to submit timely applications for admission under that order.
(b) If no protective order has been issued, the agency may withhold from the parties those portions of its report that would ordinarily be subject to a protective order. GAO will review in camera all information not released to the parties.
(c) After a protective order has been issued, counsel or consultants retained by counsel appearing on behalf of a party may apply for admission under the order by submitting an application to GAO, with copies furnished simultaneously to all parties. The application shall establish that the applicant is not involved in competitive decision-making for any firm that could gain a competitive advantage from access to the protected information and that there will be no significant risk of inadvertent disclosure of protected information. Objections to an applicant’s admission shall be raised within 2 days after receipt of the application, although GAO may consider objections raised after that time.
(d) Any violation of the terms of a protective order may result in the imposition of such sanctions as GAO deems appropriate, including referral to appropriate bar associations or other disciplinary bodies, restricting the individual’s practice before GAO, prohibition from participation in the remainder of the protest, or dismissal of the protest.
§ 21.5 Protest issues not for consideration.
A protest or specific protest allegations may be dismissed any time sufficient information is obtained by GAO warranting dismissal. Where an entire protest is dismissed, no agency report need be filed; where specific protest allegations are dismissed, an agency report shall be filed on the remaining allegations. Among the protest bases that shall be dismissed are the following:
(a) Contract administration. The administration of an existing contract is within the discretion of the agency. Disputes between a contractor and the agency are resolved pursuant to the disputes clause of the contract and the Contract Disputes Act of 1978. 41 U.S.C. 601-613.
(b) Small Business Administration issues. (1) Small business size standards and North American Industry Classification System (NAICS) standards. Challenges of established size standards or the size status of particular firms, and challenges of the selected NAICS code may be reviewed solely by the Small Business Administration. 15 U.S.C. 637(b)(6).
(2) Small Business Certificate of Competency Program. Referrals made to the Small Business Administration (SBA) pursuant to sec. 8(b)(7) of the Small Business Act, or the issuance of, or refusal to issue, a certificate of competency under that section will generally not be reviewed by GAO. The exceptions, which GAO will interpret narrowly out of deference to the role of the SBA in this area, are protests that show possible bad faith on the part of government officials, or that present allegations that the SBA failed to follow its own published regulations or failed to consider vital information bearing on the firm’s responsibility due to the manner in which the information was presented to or withheld from the SBA by the procuring agency. 15 U.S.C. 637(b)(7).
(3) Procurements under sec. 8(a) of the Small Business Act. Under that section, since contracts are entered into with the Small Business Administration at the contracting officer’s discretion and on such terms as are agreed upon by the procuring agency and the Small Business Administration, the decision to place or not to place a procurement under the 8(a) program is not subject to review absent a showing of possible bad faith on the part of government officials or that regulations may have been violated. 15 U.S.C. 637(a).
(c) Affirmative determination of responsibility by the contracting officer. Because the determination that a bidder or offeror is capable of performing a contract is largely committed to the contracting officer’s discretion, GAO will generally not consider a protest challenging such a determination. The exceptions are protests that allege that definitive responsibility criteria in the solicitation were not met and those that identify evidence raising serious concerns that, in reaching a particular responsibility determination, the contracting officer unreasonably failed to consider available relevant information or otherwise violated statute or regulation.
(d) Procurement integrity. For any Federal procurement, GAO will not review an alleged violation of subsections (a), (b), (c), or (d) of sec. 27 of the Office of Federal Procurement Policy Act, 41 U.S.C. 423, as amended by sec. 4304 of the National Defense Authorization Act for Fiscal Year 1996, Public Law 104-106, 110 Stat. 186, February 10, 1996, where the protester failed to report the information it believed constituted evidence of the offense to the Federal agency responsible for the procurement within 14 days after the protester first discovered the possible violation.
(e) Protests not filed either in GAO or the agency within the time limits set forth in § 21.2.
(f) Protests which lack a detailed statement of the legal and factual grounds of protest as required by § 21.1(c)(4), or which fail to clearly state legally sufficient grounds of protest as required by § 21.1(f).
(g) Procurements by agencies other than Federal agencies as defined by sec. 3 of the Federal Property and Administrative Services Act of 1949, 40 U.S.C. 472. Protests of procurements or proposed procurements by agencies such as the U.S. Postal Service, the Federal Deposit Insurance Corporation, and nonappropriated fund activities are beyond GAO’s bid protest jurisdiction as established in 31 U.S.C. 3551-3556.
(h) Subcontract protests. GAO will not consider a protest of the award or proposed award of a subcontract except where the agency awarding the prime contract has requested in writing that subcontract protests be decided pursuant to § 21.13.
(i) Suspensions and debarments. Challenges to the suspension or debarment of contractors will not be reviewed by GAO. Such matters are for review by the agency in accordance with the applicable provisions of the Federal Acquisition Regulation.
(j) Competitive range. GAO will not consider protests asserting that the protester’s proposal should not have been included or kept in the competitive range.
(k) Decision whether or not to file a protest on behalf of Federal employees. GAO will not review the decision of an agency tender official to file a protest or not to file a protest in connection with a public-private competition.
§ 21.6 Withholding of award and suspension of contract performance.
Where a protest is filed with GAO, the agency may be required to withhold award and to suspend contract performance. The requirements for the withholding of award and the suspension of contract performance are set forth in 31 U.S.C. 3553(c) and (d); GAO does not administer the requirements to stay award or suspend contract performance under CICA at 31 U.S.C. 3553(c) and (d).
§ 21.7 Hearings.
(a) At the request of a party or on its own initiative, GAO may conduct a hearing in connection with a protest. The request shall set forth the reasons why a hearing is needed to resolve the protest.
(b) Prior to the hearing, GAO may hold a pre-hearing conference to discuss and resolve matters such as the procedures to be followed, the issues to be considered, and the witnesses who will testify.
(c) Hearings generally will be conducted as soon as practicable after receipt by the parties of the agency report and relevant documents. Although hearings ordinarily will be conducted at GAO in Washington, DC, hearings may, at the discretion of GAO, be conducted at other locations, or by telephone or other electronic means.
(d) All parties participating in the protest shall be invited to attend the hearing. Others may be permitted to attend as observers and may participate as allowed by GAO’s hearing official. In order to prevent the improper disclosure of protected information at the hearing, GAO’s hearing official may restrict attendance during all or part of the proceeding.
(e) Hearings shall normally be recorded and/or transcribed. If a recording and/or transcript is made, any party may obtain copies at its own expense.
(f) If a witness whose attendance has been requested by GAO fails to attend the hearing or fails to answer a relevant question, GAO may draw an inference unfavorable to the party for whom the witness would have testified.
(g) If a hearing is held, each party shall file comments with GAO within 5 days after the hearing was held or as specified by GAO. If the protester has not filed comments by the due date, GAO shall dismiss the protest.
(h) In post-hearing comments, the parties should reference all testimony and admissions in the hearing record that they consider relevant, providing specific citations to the testimony and admissions referenced.
§ 21.8 Remedies.
(a) If GAO determines that a solicitation, cancellation of a solicitation, termination of a contract, proposed award, or award does not comply with statute or regulation, it shall recommend that the agency implement any combination of the following remedies:
(1) Refrain from exercising options under the contract;
(2) Terminate the contract;
(3) Recompete the contract;
(4) Issue a new solicitation;
(5) Award a contract consistent with statute and regulation; or
(6) Such other recommendation(s) as GAO determines necessary to promote compliance.
(b) In determining the appropriate recommendation(s), GAO shall, except as specified in paragraph (c) of this section, consider all circumstances surrounding the procurement or proposed procurement including the seriousness of the procurement deficiency, the degree of prejudice to other parties or to the integrity of the competitive procurement system, the good faith of the parties, the extent of performance, the cost to the government, the urgency of the procurement, and the impact of the recommendation(s) on the agency’s mission.
(c) If the head of the procuring activity determines that performance of the contract notwithstanding a pending protest is in the government’s best interest, GAO shall make its recommendation(s) under paragraph (a) of this section without regard to any cost or disruption from terminating, recompeting, or reawarding the contract.
(d) If GAO determines that a solicitation, proposed award, or award does not comply with statute or regulation, it may recommend that the agency pay the protester the costs of:
(1) Filing and pursuing the protest, including attorneys’ fees and consultant and expert witness fees; and
(2) Bid and proposal preparation.
(e) If the agency decides to take corrective action in response to a protest, GAO may recommend that the agency pay the protester the reasonable costs of filing and pursuing the protest, including attorneys’ fees and consultant and expert witness fees. The protester shall file any request that GAO recommend that costs be paid within 15 days of the date on which the protester learned (or should have learned, if that is earlier) that GAO had closed the protest based on the agency’s decision to take corrective action. The protester shall furnish a copy of its request to the agency, which may file a response within 15 days after receipt of the request, with a copy furnished to the protester.
(f)(1) If GAO recommends that the agency pay the protester the costs of filing and pursuing the protest and/or of bid or proposal preparation, the protester and the agency shall attempt to reach agreement on the amount of costs. The protester shall file its claim for costs, detailing and certifying the time expended and costs incurred, with the agency within 60 days after receipt of GAO’s recommendation that the agency pay the protester its costs. Failure to file the claim within that time may result in forfeiture of the protester’s right to recover its costs.
(f)(1) If GAO recommends that the agency pay the protester the costs of filing and pursuing the protest and/or of bid or proposal preparation, the protester and the agency shall attempt to reach agreement on the amount of costs. The protester shall file its claim for costs, detailing and certifying the time expended and costs incurred, with the agency within 60 days after receipt of GAO’s recommendation that the agency pay the protester its costs. Failure to file the claim within that time may result in forfeiture of the protester’s right to recover its costs.
(2) The agency shall issue a decision on the claim for costs as soon as practicable after the claim is filed. If the protester and the agency cannot reach agreement within a reasonable time, GAO may, upon request of the protester, recommend the amount of costs the agency should pay in accordance with 31 U.S.C. 3554(c). In such cases, GAO may also recommend that the agency pay the protester the costs of pursuing the claim for costs before GAO.
(3) The agency shall notify GAO within 60 days after GAO recommends the amount of costs the agency should pay the protester of the action taken by the agency in response to the recommendation.
§ 21.9 Time for decision by GAO.
(a) GAO shall issue a decision on a protest within 100 days after it is filed.
(b) In protests where GAO uses the express option procedures in § 21.10, GAO shall issue a decision on a protest within 65 days after it is filed.
(c) GAO, to the maximum extent practicable, shall resolve a timely supplemental protest adding one or more new grounds to an existing protest, or a timely amended protest, within the time limit established in paragraph (a) of this section for decision on the initial protest. If a supplemental or an amended protest cannot be resolved within that time limit, GAO may resolve the supplemental or amended protest using the express option procedures in § 21.10.
§ 21.10 Express options, flexible alternative procedures, accelerated schedules, summary decisions, and status and other conferences.
(a) At the request of a party or on its own initiative, GAO may decide a protest using an express option.
(b) The express option will be adopted at the discretion of GAO and only in those cases suitable for resolution within 65 days.
(c) Requests for the express option shall be in writing and received in GAO not later than 5 days after the protest or supplemental/amended protest is filed. GAO will promptly notify the parties whether the case will be handled using the express option.
(d) When the express option is used, the following schedule applies instead of those deadlines §§ 21.3 and 21.7:
(1) The agency shall file a complete report with GAO and the parties within 20 days after it receives notice from GAO that the express option will be used.
(2) Comments on the agency report shall be filed with GAO and the other parties within 5 days after receipt of the report.
(3) Where circumstances demonstrate that a case is no longer suitable for resolution using the express option, GAO shall establish a new schedule for submissions by the parties.
(e) GAO, on its own initiative or upon request by the parties, may use flexible alternative procedures to promptly and fairly resolve a protest, including alternative dispute resolution, establishing an accelerated schedule, and/or issuing a summary decision.
(f) GAO may conduct status and other conferences by telephone or in person with all parties participating in a protest to promote the expeditious development and resolution of the protest.
§ 21.11 Effect of judicial proceedings.
(a) A protester must immediately advise GAO of any court proceeding which involves the subject matter of a pending protest and must file with GAO copies of all relevant court documents.
(b) GAO will dismiss any case where the matter involved is the subject of litigation before, or has been decided on the merits by, a court of competent jurisdiction. GAO may, at the request of a court, issue an advisory opinion on a bid protest issue that is before the court. In these cases, unless a different schedule is established, the times provided in this part for filing the agency report (§ 21.3(c)), filing comments on the report (§ 21.3(i)), holding a hearing and filing comments (§ 21.7), and issuing a decision (§ 21.9) shall apply.
§ 21.12 Distribution of decisions.
(a) Unless it contains protected information, a copy of a decision shall be provided to the protester, any intervenors, and the agency involved; a copy also shall be made available to the public. A copy of a decision containing protected information shall be provided only to the agency and to individuals admitted to any protective order issued in the protest. A public version omitting the protected information shall be prepared wherever possible.
(b) Decisions may be distributed to the parties, and are available from GAO, by electronic means.
§ 21.13 Nonstatutory protests.
(a) GAO will consider protests concerning awards of subcontracts by or for a Federal agency, sales by a Federal agency, or procurements by agencies of the government other than Federal agencies as defined in § 21.0(c) if the agency involved has agreed in writing to have protests decided by GAO.
(b) The provisions of this part shall apply to nonstatutory protests except for the provision of § 21.8(d) pertaining to recommendations for the payment of costs. The provision for the withholding of award and the suspension of contract performance, 31 U.S.C. 3553(c) and (d), also does not apply to nonstatutory protests.
§ 21.14 Request for reconsideration.
(a) The protester, any intervenor, and any Federal agency involved in the protest may request reconsideration of a bid protest decision. GAO will not consider a request for reconsideration that does not contain a detailed statement of the factual and legal grounds upon which reversal or modification is deemed warranted, specifying any errors of law made or information not previously considered.
(b) A request for reconsideration of a bid protest decision shall be filed, with copies to the parties who participated in the protest, not later than 10 days after the basis for reconsideration is known or should have been known, whichever is earlier.
(c) GAO will summarily dismiss any request for reconsideration that fails to state a valid basis for reconsideration or is untimely. To obtain reconsideration, the requesting party must show that our prior decision contains errors of either fact or law, or must present information not previously considered that warrants reversal or modification of our decision; GAO will not consider a request for reconsideration based on repetition of arguments previously raised.